DF ElectricalToronto & GTA
  1. Home
  2. Panel & service upgrades
  3. Burlington
Panel upgrades · Burlington

Panel upgrades in Burlington

200 A panel and service upgrades for Burlington homes — permit, Burlington Hydro booking and inspection handled, and in most cases the lights are back on before dinner.

Typical job
1 day on site
Power off
4–8 hours
From
$3,500
Utility
Burlington Hydro

Panel upgrades in Burlington: what to expect

Most homes we open up in Burlington are post-war homes and 1970s–90s subdivisions. Homes of this age commonly have 100 or 125 A services, or a 200 A panel that's simply out of breaker spaces.

Service upgrades in Burlington need a disconnect and reconnect from Burlington Hydro. We file the ESA notification, book the utility, and on the day swap the panel, re-terminate every circuit and test before Burlington Hydro restores power — usually the same afternoon.

Adding a basement apartment is one of the most common reasons Burlington homeowners call us about their panel: a second household means a second set of loads, and often a dedicated sub-panel.

Local notes: Burlington

Lakeside and older neighbourhoods. Homes in Roseland, Shoreacres and Aldershot are often renovated extensively; the electrical should be planned for the finished house.

1980s–90s subdivisions. Millcroft and Headon Forest homes often have full panels by now — EV chargers and basement suites usually start with a load calculation.

Typical costs

ScopeTypical range
100 A → 200 A, panel and meter base in same location$3,500 – $5,500
Includes new mast / service entrance or panel relocation$5,500 – $8,000
Fuse panel replacement (keeping 100 A)$2,000 – $3,200
Sub-panel for a basement, garage or addition$1,200 – $2,500
Typical GTA ranges in 2026, for planning only. Your written quote is fixed after a site visit. Utility-side charges, if any, are billed by the utility.

Where we work in Burlington

We cover all of Burlington, including Downtown Burlington, Aldershot, Roseland, Shoreacres, Tyandaga, Headon Forest, Millcroft, Orchard, Alton Village, Brant Hills. Every job starts the same way: a site visit, a written fixed quote, then the work — permit included.

More on this service: Panel & service upgrades · Electrician in Burlington

Questions from Burlington

How long does a panel upgrade take in Burlington?

Usually one day on site with four to eight hours without power. Booking the Burlington Hydro disconnect typically takes one to three weeks.

Who handles the Burlington Hydro side?

We do. We book the disconnect and reconnect with Burlington Hydro and file the ESA permit — you don't need to call either.

Do all Burlington homes need 200 A?

No. If you're only adding an EV charger, load management can often avoid an upgrade. We'll calculate your actual load first.

Panel upgrades nearby

Oakville · Milton · Toronto · Etobicoke · North York · Scarborough · East York · Mississauga

Free written quote

Panel upgrades in Burlington? Flip it on.

Tell us what you need — a single circuit or a full fit-out. You get a written, itemized quote, and a straight answer on whether you need the work at all.

CallFree quote