Panel upgrades in Etobicoke: what to expect
Most homes we open up in Etobicoke are 1920s–40s lakeshore homes, post-war bungalows and 1960s–70s family homes. Older houses here are often still on 60 or 100 A services — fine when they were built, tight once you add central air, an EV and an induction range.
Service upgrades in Etobicoke need a disconnect and reconnect from Toronto Hydro. We file the ESA notification, book the utility, and on the day swap the panel, re-terminate every circuit and test before Toronto Hydro restores power — usually the same afternoon.
Adding a basement apartment is one of the most common reasons Etobicoke homeowners call us about their panel: a second household means a second set of loads, and often a dedicated sub-panel.
Local notes: Etobicoke
Lakeshore and The Kingsway. Older homes in Mimico, New Toronto, Long Branch and The Kingsway can still carry original wiring and undersized services. We see a lot of rewires and 200 A upgrades timed with kitchen or basement renovations.
Bungalow conversions. Post-war bungalows in Alderwood and Eatonville are frequently gutted and rebuilt inside or raised to a second storey — the right moment to replace the service and plan circuits for modern loads.
Typical costs
| Scope | Typical range |
|---|---|
| 100 A → 200 A, panel and meter base in same location | $3,500 – $5,500 |
| Includes new mast / service entrance or panel relocation | $5,500 – $8,000 |
| Fuse panel replacement (keeping 100 A) | $2,000 – $3,200 |
| Sub-panel for a basement, garage or addition | $1,200 – $2,500 |
Where we work in Etobicoke
We cover all of Etobicoke, including The Kingsway, Mimico, New Toronto, Long Branch, Islington Village, Humber Valley, Alderwood, Rexdale, Markland Wood, Eatonville. Every job starts the same way: a site visit, a written fixed quote, then the work — permit included.
More on this service: Panel & service upgrades · Electrician in Etobicoke
Questions from Etobicoke
How long does a panel upgrade take in Etobicoke?
Usually one day on site with four to eight hours without power. Booking the Toronto Hydro disconnect typically takes one to three weeks.
Who handles the Toronto Hydro side?
We do. We book the disconnect and reconnect with Toronto Hydro and file the ESA permit — you don't need to call either.
Do all Etobicoke homes need 200 A?
No. If you're only adding an EV charger, load management can often avoid an upgrade. We'll calculate your actual load first.