DF ElectricalToronto & GTA
  1. Home
  2. Panel & service upgrades
  3. Pickering
Panel upgrades · Pickering

Panel upgrades in Pickering

200 A panel and service upgrades for Pickering homes — permit, Elexicon Energy booking and inspection handled, and in most cases the lights are back on before dinner.

Typical job
1 day on site
Power off
4–8 hours
From
$3,500
Utility
Elexicon Energy

Panel upgrades in Pickering: what to expect

Most homes we open up in Pickering are 1960s–80s lakeside homes and brand-new communities. Homes of this age commonly have 100 or 125 A services, or a 200 A panel that's simply out of breaker spaces.

Service upgrades in Pickering need a disconnect and reconnect from Elexicon Energy. We file the ESA notification, book the utility, and on the day swap the panel, re-terminate every circuit and test before Elexicon Energy restores power — usually the same afternoon.

Adding a basement apartment is one of the most common reasons Pickering homeowners call us about their panel: a second household means a second set of loads, and often a dedicated sub-panel.

Local notes: Pickering

Older lakeside homes. Bay Ridges and West Shore homes from the 1960s–70s are candidates for panel upgrades and wiring checks, including possible aluminum branch wiring.

New communities. New homes in Seaton and Duffin Heights mostly need additions: EV chargers, basement finishing, pot lights and exterior lighting.

Typical costs

ScopeTypical range
100 A → 200 A, panel and meter base in same location$3,500 – $5,500
Includes new mast / service entrance or panel relocation$5,500 – $8,000
Fuse panel replacement (keeping 100 A)$2,000 – $3,200
Sub-panel for a basement, garage or addition$1,200 – $2,500
Typical GTA ranges in 2026, for planning only. Your written quote is fixed after a site visit. Utility-side charges, if any, are billed by the utility.

Where we work in Pickering

We cover all of Pickering, including Bay Ridges, West Shore, Amberlea, Liverpool, Rouge Park, Duffin Heights, Seaton, Dunbarton. Every job starts the same way: a site visit, a written fixed quote, then the work — permit included.

More on this service: Panel & service upgrades · Electrician in Pickering

Questions from Pickering

How long does a panel upgrade take in Pickering?

Usually one day on site with four to eight hours without power. Booking the Elexicon Energy disconnect typically takes one to three weeks.

Who handles the Elexicon Energy side?

We do. We book the disconnect and reconnect with Elexicon Energy and file the ESA permit — you don't need to call either.

Do all Pickering homes need 200 A?

No. If you're only adding an EV charger, load management can often avoid an upgrade. We'll calculate your actual load first.

Panel upgrades nearby

Ajax · Whitby · Oshawa · Toronto · Etobicoke · North York · Scarborough · East York

Free written quote

Panel upgrades in Pickering? Flip it on.

Tell us what you need — a single circuit or a full fit-out. You get a written, itemized quote, and a straight answer on whether you need the work at all.

CallFree quote